Bau Bang BW Factory

INVESTOR

N/a

EXPECTED COMPLETION

BW CN Development Joint Stock Company

SCALE

Area: 3.200 m2

PROGRESS

Completed

LOCATION

Bau Bang Industrial Park, Binh Duong

PACKAGE

Structure, finishing and MEP works

Bau Bang BW Factory
Bau Bang BW Factory
Bau Bang BW Factory
Bau Bang BW Factory
Bau Bang BW Factory
Bau Bang BW Factory
Bau Bang BW Factory
Bau Bang BW Factory
Bau Bang BW Factory
Bau Bang BW Factory

OTHER PROJECT

thumb

ZHENGXING (VIETNAM) FACTORY - TOWER C & D

  • Thanh Thanh Cong Industrial Park, Trang Bang, Tay Ninh

  • 6.8 hectares. Phase II: 2.0 hectares; comprising Workshops C and D with a total floor area of 32,000 m². Along with auxiliary facilities and external roads covering 1,000 m².

See details
thumb

Eco Retreat

  • Nguyen Huu Tri Street, Thanh Phu, Ben Luc, Long An

  • 220 hectares

See details
thumb

Package 5.10 "Construction and Installation of Passenger Terminal Equipment at Long Thanh Airport"

  • Long Thanh District, Dong Nai Province

  • An Area of 376,000 square meters, featuring two separate arrival and departure concourses, consisting of 1 ground floor and 3 upper floors, with a peak roof height of 45.55 meters and provision for 40 parking positions for Code C, E, F aircraft.

See details