Foxconn Bac Giang Factory

INVESTOR

Fuyu Precision Technology Co., Ltd

EXPECTED COMPLETION

04/2021

SCALE

Construction area: Workshop F12A: 24.806 m2- Workshop F16: 24.806 m2- Workshop M11: 23.782 m2- Workshop F02,F06,F07: 24.806m2 x 3- Workshop F03,F05: 9931 m2- Workshop F13,F15: 9931 m2

PROGRESS

Under construction

LOCATION

Quang Chau Industrial Park, Viet Yen District, Bac Giang Province

PACKAGE

Structure work

Foxconn Bac Giang Factory
Foxconn Bac Giang Factory
Foxconn Bac Giang Factory
Foxconn Bac Giang Factory
Foxconn Bac Giang Factory
Foxconn Bac Giang Factory
Foxconn Bac Giang Factory
Foxconn Bac Giang Factory
Foxconn Bac Giang Factory
Foxconn Bac Giang Factory
Foxconn Bac Giang Factory
Foxconn Bac Giang Factory
Foxconn Bac Giang Factory
Foxconn Bac Giang Factory

OTHER PROJECT

thumb

ZHENGXING (VIETNAM) FACTORY - TOWER C & D

  • Thanh Thanh Cong Industrial Park, Trang Bang, Tay Ninh

  • 6.8 hectares. Phase II: 2.0 hectares; comprising Workshops C and D with a total floor area of 32,000 m². Along with auxiliary facilities and external roads covering 1,000 m².

See details
thumb

Eco Retreat

  • Nguyen Huu Tri Street, Thanh Phu, Ben Luc, Long An

  • 220 hectares

See details
thumb

Package 5.10 "Construction and Installation of Passenger Terminal Equipment at Long Thanh Airport"

  • Long Thanh District, Dong Nai Province

  • An Area of 376,000 square meters, featuring two separate arrival and departure concourses, consisting of 1 ground floor and 3 upper floors, with a peak roof height of 45.55 meters and provision for 40 parking positions for Code C, E, F aircraft.

See details