N/a
Completed
Construction area: 200.000 m²
Completed
Lot 40-6, Phuoc Dong Industrial Park, Go Dau, Tay Ninh
Structure, finishing and MEP works
Phuoc Dong Industrial Park, Gia Loc Ward, Tay Ninh Province
3.5 hectares
Thanh Thanh Cong Industrial Park, Trang Bang, Tay Ninh
6.8 hectares. Phase II: 2.0 hectares; comprising Workshops C and D with a total floor area of 32,000 m². Along with auxiliary facilities and external roads covering 1,000 m².
Quang Chau Industrial Zone, Bac Giang.
2 factories A01 and A02, each with 5 floors, an area of 69,000m2/factories. LOCATION: Quang Chau Industrial Zone, Bac Giang.