Timberland Co., Ltd - part of ManWah Group
Completed
Construction are: 77,000m2
Completed
Tan Uyen District, Binh Duong Province
Construction of workshops B3, B4, C1, C2 including structure, finishing and MEP
Phuoc Dong Industrial Park, Gia Loc Ward, Tay Ninh Province
3.5 hectares
Thanh Thanh Cong Industrial Park, Trang Bang, Tay Ninh
6.8 hectares. Phase II: 2.0 hectares; comprising Workshops C and D with a total floor area of 32,000 m². Along with auxiliary facilities and external roads covering 1,000 m².
Quang Chau Industrial Zone, Bac Giang.
2 factories A01 and A02, each with 5 floors, an area of 69,000m2/factories. LOCATION: Quang Chau Industrial Zone, Bac Giang.