Vingroup
Completed
MEP works for Automation Factory and Painting Factory; structural work of substructure tank of Lear Factory and structural work of Lear Factory
Completed
Cat Hai Island, Cat Hai District, Hai Phong
Construction area: 84,000 m2; Painting Factoty: 22,000m2; Engine Factory: 50,000m2; Lear Factory: 12,000m2
Long Thanh District, Dong Nai Province
An Area of 376,000 square meters, featuring two separate arrival and departure concourses, consisting of 1 ground floor and 3 upper floors, with a peak roof height of 45.55 meters and provision for 40 parking positions for Code C, E, F aircraft.
Ho Chi Minh city
The project has three main components of: The passenger terminal, the multi-story car park combined with non-aviation services, and the pre-terminal bridge system.
Quang Chau Industrial Zone, Bac Giang.
2 factories A01 and A02, each with 5 floors, an area of 69,000m2/factories. LOCATION: Quang Chau Industrial Zone, Bac Giang.