Banner

Project

thumb

K8HH1 High-Rise Mixed-Use Building

  • Tay Ho Tay Urban Area, Hanoi

  • 01 office tower: 20 floors; 02 residential towers – 26 floors, providing 284 premium apartments; 02 basement levels. Total construction area: 113,301 m²

See details
thumb

LUMI HANOI

  • Hanoi

  • 4,000 apartments across 9 towers ranging from 29 to 35 stories

See details
thumb

ELYSIAN

  • 170 Lo Lu, Truong Thanh Ward, Thu Duc City

  • 4 apartment towers, each consisting of 1 basement and 21 floors, 1398 luxury apartments

See details
thumb

TT AVIO

  • The DT743A road, Tan Dong Hiep Ward, Di An City, Binh Duong Province

  • 1.6-hectare site, features two towers, A and B, rising 30 and 37 stories respectively

See details
thumb

MATRIX ONE - Phase 2

  • Me Tri Ward, Nam Tu Liem District, Hanoi

  • 3 basement levels and 37 above-ground floors

See details
thumb

The Gio Riverside

  • DT16 Street, Binh An Ward, Di An City, Binh Duong Province

  • 2 towers, each tower has 3 basements, 40 floors and total construction floor area: 297,000 m2

See details
thumb

ORIENTAL SQUARE OFFICE BUILDING

  • The Starlake urban area, Xuân Tao Ward, Bac Tu Liem District, Hanoi

  • Total floor area of about 28,000 m2, including 16 above-ground floors and 03 basement floors

See details
thumb

Office Building 63 Cao Thang

  • Ho Chi Minh City

  • 4 basement floors, 14 above floors

See details
thumb

CENTRAL PARK RESIDENCES – ECO CENTRAL PARK VINH

  • Vinh City, Nghe An province

  • - Land area: 19.196m2. - 02 mixed-use apartment towers, each with 2 basements and 30 stories. - 30 stories including 03 of Commercial and Service levels, 01 refuge floor, 26 apartment floors, total of 620 apartments.

See details
thumb

Package 5.10 "Construction and Installation of Passenger Terminal Equipment at Long Thanh Airport"

  • Long Thanh District, Dong Nai Province

  • An Area of 376,000 square meters, featuring two separate arrival and departure concourses, consisting of 1 ground floor and 3 upper floors, with a peak roof height of 45.55 meters and provision for 40 parking positions for Code C, E, F aircraft.

See details
thumb

The construction project for Terminal 3 - Tan Son Nhat International Airport Passenger Terminal.

  • Ho Chi Minh city

  • The project has three main components of: The passenger terminal, the multi-story car park combined with non-aviation services, and the pre-terminal bridge system.

See details
thumb

NHÀ XƯỞNG FOXCONN – BẮC GIANG xưởng A1 và A2

  • Quang Chau Industrial Zone, Bac Giang.

  • 2 factories A01 and A02, each with 5 floors, an area of 69,000m2/factories. LOCATION: Quang Chau Industrial Zone, Bac Giang.

See details